1 awarded / planned · 2 closed / inactive · 5 open · 1 past listed deadline / extension unverified · 1 proposal signal. Verified September 9, 2026. Deadlines can change; confirm amendments with the issuer.
Showing all 10 records.
No reviewed records match these filters. Reset filters to see the full snapshot; this is not proof that no opportunities exist.
OPEN RFP · CITY VIDEO PROVIDED
Video Traffic Count Services
City of Raleigh, Transportation Department
Raleigh, North Carolina · 274-TR-2026-06 · due October 1, 2026 at 4:00 p.m. (packet says EST; confirm issuer time)
Convert City-collected recordings into turning-movement, pedestrian, bicycle and vehicle-classification counts plus gap/delay reports. Estimated 450 six-hour locations across 24 months. No additional hardware or optional field capture is sought. Appendix I specifies 95% accuracy; capability and reference requirements need review. Questions due September 10 at 2 p.m.; hard copies plus USB, not electronic portal submission. No award or available subcontract is verified.
Project type: Authorized video review · Traffic counts · Pedestrian / bicycle counts
Source verified September 9, 2026
Open official sourceOPEN RFQ · AIRPORT
Airport Traffic Count & Planning Analysis
Spokane Airport Board
Spokane International Airport, Washington · 26-43-9999-031 · due October 30, 2026 at 4:00 p.m. (issuer local time)
Collect roadway and intersection traffic counts at the airport and business park for future development, efficiency and safety. The RFQ seeks a professional-services team and asks proposers to identify subconsultants; this does not establish an available subcontract. Non-mandatory information meeting October 7. Five hard copies and a PDF on a thumb drive required; award is only anticipated for January 2027.
Project type: Traffic counts · Transportation planning with field data
Source verified September 9, 2026
Open official sourceOPEN RFP · TRANSIT FIELD SURVEY
Regional On-Board Transit Survey
Piedmont Authority for Regional Transportation (PART)
Piedmont Triad, North Carolina · 02-OBTS-2026 · proposals due September 30, 2026 at 5:00 p.m. (notice does not specify zone)
Consultant-led on-board survey and field-data collection for regional travel-model calibration: origins/destinations, access modes, transfers and travel behavior. This is passenger survey work, not parking-video counting, and requires a separate staffing/privacy plan. NCDOT discipline 422 prequalification is required; applicants may show submission by September 30, with approval required by BAFO. The portal says “Open Until Contracted” but explicitly requires proposals by September 30. No selected prime or uncovered subcontract is confirmed.
Project type: Transit field survey
Source verified September 9, 2026
Open official sourcePAST LISTED DEADLINE · EXTENSION UNVERIFIED
Downtown Fairfield Parking Study
MetroCOG / Town of Fairfield
Fairfield, Connecticut · due September 11, 2026 at 2:00 p.m. (issuer local time)
Inventory, mapped utilization, lunch and evening peak counts, pedestrian access and curb/loading observations support a full parking master plan. Qualifications-based prime selection; no prime or subcontract need is confirmed. Check the issuing page and amendments before preparing a response. The listed September 11 deadline has passed. The issuer RFQ and response-to-inquiries document were checked September 12; no extension was verified. This does not establish legal closure, cancellation or award.
Project type: Parking occupancy · Curb / loading
Source verified September 12, 2026
Open official sourceOPEN RFP
Downtown Parking Management Plan
City of Los Baños
Los Baños, California · due October 2, 2026 at 4:00 p.m. (issuer local time)
The packet calls for parking inventory, peak and off-peak utilization, turnover and duration, curb use and GIS-compatible data. A full planning assignment, not a standalone counting contract. Sealed paper proposals are required; email and fax proposals are not accepted.
Project type: Parking occupancy · Turnover / duration · Curb / loading
Source verified September 9, 2026
Open official sourceOPEN RFP · DESIGN-LED
Municipal Parking Master Plan
Borough of Hanover
Hanover Borough, Pennsylvania · due October 9, 2026; time not stated in notice
The August 17 notice seeks engineering, landscaping and planning firms for Borough-owned surface lots: capacity, stormwater, accessibility, lighting and consistent signage. Occupancy counts or a separate data-collection package are not confirmed in this notice. Read the full RFP before deciding fit.
Project type: Design-led / scope unconfirmed
Source verified September 9, 2026
Open official sourceAWARDED · FIELDWORK PLANNED
Citywide Parking Study
City of Kingston
Kingston, New York · official notice July 10, 2026
The City confirms a contract with Stantec, with Highland Planning and M&P Engineering and Land Surveying on the team. The notice schedules occupancy collection for early fall and a public meeting for October 2026; actual fieldwork completion is not verified. Not an open bid and not evidence of an available subcontract.
Project type: Parking occupancy
Source verified September 9, 2026
Open official sourcePROPOSAL / PLANNING SIGNAL
Downtown Cohasset Parking Study
Town of Cohasset
Cohasset, Massachusetts · HSH proposal revised August 10, 2026
The Town-hosted proposal describes a public-parking inventory, weekday and Saturday occupancy counts and optional turnover work. Town approval fields are blank in this document. This is not proof of a final award, an open solicitation or an uncovered subcontract need.
Project type: Parking occupancy · Turnover / duration
Source verified September 9, 2026
Open official sourceDEADLINE PASSED · AWARD UNKNOWN
Traffic Data Collection & Analysis
Bismarck-Mandan MPO / City of Bismarck
Bismarck-Mandan region, North Dakota · proposals were due August 14, 2026 at 4:00 p.m. Central
The RFP requests 48-hour counts at up to 40 locations, including turning movements and bicycle/pedestrian counts, plus Excel, GIS and raw 15-minute data. County-requested segment counts are included. The packet plans late-September/October fieldwork and December completion; these are planned dates, not proof work started. Published project budget is not-to-exceed $37,000, not an awarded fee. Approved sub-agreements for minor portions are permitted, but a winner or available subcontract is unverified.
Project type: Traffic counts · Pedestrian / bicycle counts · Transportation planning with field data
Source verified September 9, 2026
Open official sourceINACTIVE SAM NOTICE · HISTORICAL REFERENCE
FHWA Transportation Planning & Traffic Monitoring IDIQ
FHWA, Eastern Federal Lands Highway Division
Federal / nationwide scope · 693C7324R000013 · offers were due April 17, 2024 at 2:00 p.m. EDT
Public SAM notice explicitly includes manual/automated traffic counts, vehicle occupancy, turning movements and field-data collection within broader licensed engineering/planning work. SAM labels this notice inactive as of September 26, 2024. Its $60 million shared IDIQ capacity is neither a specific project fee nor available subcontract budget. Retained as a federal scope reference, not a current bid or proof of an open task order.
Project type: Traffic counts · Transportation planning with field data
Source verified September 9, 2026
Open official source